The first step in any construction project is site preparation.

Before building on any piece of raw land, a site preparation service must convert it into one that is ready to break ground and have a building foundation put in.

When starting your project, keep these important details in mind to make sure your site prep work is done correctly and there is little concern necessary about things going wrong.

1. Construction Site Planning

Before any kind of site preparation is started, it is essential to have a fully laid out plan for the whole construction project.

This is basically a blueprint of the ground and what it should look once the job is complete.

To create this plan, work with site preparation services and building contractors to assess things like ground elevation and drainage, building location, and what must be done to create a solid building pad.

Ground conditions will play an important role in determining the best place to situate the building.

2. Timeline Planning

After the construction site has been planned out, contractors will typically create a project plan and timeline.

From the start of the site preparation work to doing the finishing landscaping around the new building, keeping a project on schedule is important, both for the many contractors doing the work and for the owner.

When things go off schedule, costs go up.

Work with services that can communicate well with each other and find ways to resolve problems that arise to keep projects moving according to projected timelines.

Finishing building projects on time requires cooperation from all involved with it.

3. Locating Or Mapping Out Utilities

Another critical issue that must be addressed before any kind of groundwork actually begins is mapping out where the underground utilities will be installed or locating any that are already present.

Hitting underground lines while completing this work just creates delays and increases costs on top of being very dangerous.

Call in the utilities first to locate and label the different lines or find out where they will be installed so all groundwork can be safely completed.

4. Site and Perimeter Access

Before actual site preparation can begin, the equipment has to get there first.

The easiest way to do that is to excavate appropriate site access for the movement of equipment to and from the location without damaging the surrounding grounds or the location of the building pad.

This access should also include areas where the building materials can be placed.

Then once the equipment makes it in and the building site is prepared, site prep services must construct perimeter access around the finished building pad.

This allows other equipment to get in closer without damaging the pad or encountering other issues.

5. Building Pad Preparation

Between putting in site access and then perimeter access, the main building pad is constructed.

This final part of the site preparation work before construction begins is done once all ground elevation and drainage issues have been resolved and underground utilities located or mapped.

Pad construction must be well-executed, the pad built up, and then compacted as required for the building plan.

The next step in the project is to trench for the foundation.

A solid building pad and foundation are what will soon hold up the entire new building.

Qualified Site Preparation Services Avoid Potential Project Issues

While site preparation work is only the first of many steps in the constriction process, it lays the groundwork for a successful project.

With proper planning and attention to detail, good site prep will result in a well-constructed building pad on time and without the problems that can affect the entire job.

Always hire a qualified site prep service that has the experience to do it right!